翻訳と辞書
Words near each other
・ Pacific Northwest languages
・ Pacific Northwest League
・ Pacific Northwest lumber strike
・ Pacific Highway Border Crossing
・ Pacific Hills Christian School
・ Pacific Hills School
・ Pacific Historical Review
・ Pacific Hockey League
・ Pacific Hockey League (1994)
・ Pacific Horizon Investment Trust
・ Pacific horned frog
・ Pacific House, California
・ Pacific hurricane
・ Pacific Hydro
・ Pacific imperial pigeon
Pacific Imperial Railroad
・ Pacific Insects
・ Pacific Insects Monograph
・ Pacific Institute
・ Pacific Institute for the Mathematical Sciences
・ Pacific Institute of Culinary Arts
・ Pacific Institute of Public Policy
・ Pacific International
・ Pacific International Enterprises
・ Pacific International Lines
・ Pacific International University
・ Pacific Internet
・ Pacific Interpreters
・ Pacific Island Air
・ Pacific Island Aviation


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Pacific Imperial Railroad : ウィキペディア英語版
Pacific Imperial Railroad

The Pacific Imperial Railroad (reporting mark PIR) is a company in possession of the SD&AE Desert Line right of way in Southern California, colloquially referred to as the Desert Line. The Desert Line starts at the border crossing at Division, near Campo at Milepost 59.94 (inside Tunnel #4) in eastern San Diego County, California where it connects with the Baja California Railroad in Mexico, and stretches 70.1 miles through the Jacumba Mountains to El Centro, California, where it connects to Union Pacific Railroad at Milepost 129.61. The significance of the Desert Line is that it provides an alternative rail route to and from the east for servicing the distribution, transportation, and supply chain needs of the Cali-Baja region.
==History==
In 2012, following the embargo of the Carrizo Gorge Railway (CZRY) in October 2008 and the loss of operating rights in the Mexican Tecate-Tijuana segment, Pacific Imperial Railroad, Inc. replaced the San Diego and Imperial Valley Railroad as the rail operator between Plaster City and the border near Campo.〔(【引用サイトリンク】url=http://www.sdmts.com/MTS/documents/2012-9-20_000.pdf )
Pacific Imperial Railroad, Inc. (PIR), was incorporated in Delaware on October 27, 2011〔(【引用サイトリンク】url=https://delecorp.delaware.gov/tin/controller )〕 and qualified to do business in California on April 23, 2012,〔(【引用サイトリンク】url=http://kepler.sos.ca.gov/ )〕 having its stated objectives being to lease, rehabilitate, reopen and resume service, manage, operate, and maintain the entire Desert Line from "Mileposts 59.94" at or near the U.S. Border in "Division" to "Milepost 130.0" at Plaster City, west of El Centro. On December 20, 2012, PIR executed a 99-year lease with San Diego and Arizona Eastern Railway (SD&AE) and San Diego Metropolitan Transit System (MTS), owners of the Desert Line right of way. The Desert Line extends from east San Diego County (border with Baja California) to western Imperial County.
According to an article in the San Diego Union-Tribune, in early 2014, a management team hired by the company left, alleging that investor money was fraudulently diverted to company principals. Company officials denied that was the case, and MTS said it found no evidence of any fraud.
On or around October 17, 2014, Mexico's Baja California Railroad (BJRR) ended negotiations with PIR with concerns over the U.S. company's rights to haul freight through Mexico across the former Tijuana and Tecate Railroad. An article from the ''San Diego Reader'' implied that goods from San Diego may have to be trucked through Mexico and then loaded onto trains in the United States before continuing to El Centro to interchange with the Union Pacific Railroad. However, there was an apparent turning point in the negotiations between BJRR and PIR sometime during the first half of 2015. On June 22, 2015 at the MTS headquarters in Downtown, San Diego, Baja California Railroad and Pacific Imperial Railroad reached a significant step by executing a memorandum of understanding expressly acknowledging the parties' desire and intent to work together to develop a binational railroad and outlining the expectations and issues that need to be resolved. The MOU states that the parties will use their best efforts to reach a "definitive agreement" on these outstanding issues within six months. Additionally, acknowledging that the delays in reaching an agreement with BJRR have also delayed the construction work necessary to bring the Desert Line back to an operational condition making it highly unlikely that PIR would be able to run a test train by the December 2015 lease dealine, PIR's management proposed that MTS agree to modify certain performance milestones so as to not be in violation of the lease.
Subsequently, on July 17, 2015 PIR announced on the company's website that the new milestones were approved by the MTS Board of Directors by a 17-0 vote.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Pacific Imperial Railroad」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.